Verified Project Cases
Industrial Project Cases
Real supply and coordination cases across CNC, building materials production, steel, refractory, plastic recycling, solar and cross-border industrial projects – serving buyers across the Middle East, Central Asia, Southeast Asia and Africa.
All cases use regional labels only. Client names and specific country identifiers are not published in line with our confidentiality policy.
Proof of Delivery
All Project Cases
Showing verified cases across all solution categories. Featured cases appear first.
Filter by Category
Middle East
Building Materials Production
Turnkey Production Line Supply
A complete turnkey paper-faced gypsum board line for a greenfield investor — from calcination to packed boards. 3,000,000 sq.m/year, delivered within 9 months.
Capacity:
3,000,000 sq.m/year (12 mm board basis)
Timeline:
Delivered within 9 months
Client:
Plant Investor / Greenfield Manufacturer
Central Asia
CNC & Precision Manufacturing
Factory Expansion – Equipment Supply
Ten FEELER machining centres supplied, installed and accepted within six months for a factory expansion — output reached 50,000+ parts/month after ramp-up.
Capacity:
50,000+ parts/month after ramp-up
Timeline:
All 10 machines delivered, installed and accepted within 6 months of contract
Client:
General Machinery Parts Supplier
Africa
Steel & Metal Materials
Material Supply
5,000+ MT of H-beams, I-beams and heavy plate from three mills, delivered in four shipments to an EPC contractor’s construction schedule — with zero site rejections.
Capacity:
5,000+ metric tons
Timeline:
Delivered over 6 months in 4 shipments
Client:
EPC Contractor
Middle East
Building Materials Production
Turnkey Production Line Supply
A complete turnkey paper-faced gypsum board line for a greenfield investor — from calcination to packed boards. 3,000,000 sq.m/year, delivered within 9 months.
Capacity:
3,000,000 sq.m/year (12 mm board basis)
Timeline:
Delivered within 9 months
Client:
Plant Investor / Greenfield Manufacturer
Middle East
Building Materials Production
Turnkey Production Line Supply (line 1) · Equipment Supply (line 2)
A refractory manufacturer’s first calcium silicate insulation plant — built from zero process know-how, installed through a travel shutdown and brought to stable production remotely. The client has since added a second line and asked us to plan a third.
Capacity:
Single line in regular production at about 3,000 m³/year
Timeline:
Line 1 installed Nov 2019 – Feb 2020; line 2 installed May 2025
Client:
Refractory and insulation materials manufacturer
Central Asia
CNC & Precision Manufacturing
Factory Expansion – Equipment Supply
Ten FEELER machining centres supplied, installed and accepted within six months for a factory expansion — output reached 50,000+ parts/month after ramp-up.
Capacity:
50,000+ parts/month after ramp-up
Timeline:
All 10 machines delivered, installed and accepted within 6 months of contract
Client:
General Machinery Parts Supplier
Southeast Asia
CNC & Precision Manufacturing
Equipment Supply & Commissioning
Four WIMENT high-speed machining centres for micro-hole arrays in ceramic test sockets and silicon parts — ±0.01 mm hole position, yield raised to 96%+.
Capacity:
10,000+ precision parts/month
Timeline:
3 Months
Client:
Semiconductor Components Manufacturer
Africa
Steel & Metal Materials
Material Supply
5,000+ MT of H-beams, I-beams and heavy plate from three mills, delivered in four shipments to an EPC contractor’s construction schedule — with zero site rejections.
Capacity:
5,000+ metric tons
Timeline:
Delivered over 6 months in 4 shipments
Client:
EPC Contractor
Central Asia
Steel & Metal Materials
Material Supply — infrastructure project
About 9,600 t of rebar, wire rod, sections, plate and pipe from three mills, delivered by rail in four shipments through winter — all accepted on site with no quality claims.
Capacity:
Approx. 9,600 t
Timeline:
First shipment within 30 days of contract; four shipments over about 10 months, through winter
Client:
EPC Contractor
Middle East
Refractory Materials & Furnace Solutions
Material Supply
A zoned EAF lining — high-alumina brick for the hearth, magnesia-carbon brick at the slag line — 300+ tons for an 80–100 t furnace, delivered within three months.
Capacity:
300+ tons — one complete furnace lining campaign, including first repair bricks
Timeline:
Delivered within 3 months
Client:
Steel Mill
Middle East
Refractory Materials & Furnace Solutions
Long-Term Supply Contract — annual framework agreement with purchase orders per maintenance window
An annual framework for refractories, kiln parts and ~300 spare-part SKUs for a 3,000 t/d cement plant — renewed three years running, with annual shutdowns cut from 28 to 18–20 days.
Capacity:
Annual framework: 350–500 t refractory brick per year, plus kiln parts and ~300 spare-part SKUs
Timeline:
Ongoing — renewed annually for 3+ years
Client:
Cement Production Plant (3,000 t/d clinker line)
West Africa
Renewable Energy & Solar
Equipment Supply & Commissioning — off-grid solar–diesel hybrid with battery storage
3 MWp of solar and 3 MWh of battery storage, running in parallel with existing diesel generators at an off-grid mining camp — diesel consumption down 55–65%.
Capacity:
3 MWp (DC) / 3 MW (AC) solar; 3 MWh battery storage
Timeline:
10-week factory supply cycle; about 22–25 weeks from order to site
Client:
Mining Camp (off-grid)
Start a Project
Have a Similar Project in Mind?
Tell us your project type, target market and requirements – our team will help you identify the right solution direction.