Titanium Grade 11
Titanium Grade 11 is similar to Grade 1 but with added palladium (Pd), which enhances corrosion resistance. This alloy offers optimum ductility, excellent cold formability, and good strength. It also has high impact toughness and is highly weldable.
Supplier Origin
China – Verified Manufacturer
Coordination
Singapore-Based · UEN 202519429N
Reference products from established manufacturers. YUXINGCORP coordinates sourcing; it is not the manufacturer.
| Chemical Analysis of Titanium Grade 11 | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Chemical composition (weight %) | |||||||||||||
| % | O | N | C | H | Fe | Al | V | Ni | Mo | Pd | Others | Residuals | Ti |
| max | 0.18 | 0.03 | 0.08 | 0.015 | 0.20 | 0.12-0.25 | 0.4 | Bal |
Standard:
- ASTM B338 / ASME SB338
- ASTM B861 / ASME SB861
- ASTM B862 / ASME SB862
Size Specifications:
- Outer Diameter (OD): 6.0 mm – 150 mm
- Wall Thickness: 0.4 mm – 15 mm
- Length: Up to 15,000 mm
Where it is used
Grade 11 is Grade 1 titanium with a small palladium addition. Its tubes are used in chemical equipment that needs both heavy forming and resistance to reducing acids or crevice corrosion, such as heat exchangers and process lines in chlor-alkali and acid service.
How to choose
Choose Grade 11 when you need the formability of Grade 1 and better corrosion resistance than the pure grades. It has lower strength than Grade 7, so check the wall thickness for the design pressure. Grade 17 is a lower-palladium, lower-cost version of the same idea.
What to send for a quotation
Send the grade, standard (ASTM B338 for condenser and heat exchanger tubes, B861 for seamless pipe, B862 for welded pipe), seamless or welded, outside diameter, wall thickness, length, quantity, and the tests and certificates you need (for example eddy current or hydrostatic testing and EN 10204 3.1 certificates).
Spec sheet
Titanium Grade 11
PDF · Specification for reference
How We Work - Our Commitments
Each commitment carries a condition and a remedy. A promise without conditions is marketing.
- Sourcing & Supplier Matching
Commitment:
A written sourcing report within 48 hours of a complete requirement brief.
Conditions:
Requires machine type or output target, destination country, and timeline. Custom or multi-line projects may take longer – we tell you upfront.
Remedy:
If we cannot meet it, you receive an interim response with a firm date –
not silence.
- Pre-Shipment Inspection
Commitment:
Third-party pre-shipment inspection – SGS or BV – before balance payment is released.
Conditions:
Included as standard on production-line projects. Available on request for single machines. Scope agreed in writing before booking.
Remedy:
If inspection fails against the agreed specification, shipment does not release until corrected or you approve a deviation in writing.
- Export Documentation
Commitment:
Complete export document pack – commercial invoice, packing list, certificate of origin, and destination-specific conformity documents.
Conditions:
Destination conformity regimes (CE, EAC, SABER/SASO, PVOC, SONCAP) vary and change. We confirm the applicable route per project before contract.
Remedy:
If a document we are responsible for causes a customs hold, we resolve it and carry the correction cost.
- Warranty & After-Sales
Commitment:
12-month equipment warranty with a named responsible contact and a written spare-parts dispatch commitment.
Conditions:
Covers manufacturing defects under normal operation and specified maintenance. Wear parts and consumables excluded.
Remedy:
Dispatch window and remedy – details to be confirmed. Contact us for project-specific warranty terms.
Need configuration advice, landed cost estimate or a project-specific sourcing report? Submit your requirements.
What we handle
Equipment sourcing & supplier coordination
Pre-shipment inspection – SGS or BV – before balance payment
Export documentation – invoice, packing list, certificate of origin
Customs clearance & destination conformity support
Shipping & freight logistics coordination
Installation guidance & commissioning support