Metal Intalox Saddle Rings
Metal Intalox Saddle Rings offer a distinctive structure that combines the features of both rings and saddles, creating a large, circular liquid channel. This design reduces gas resistance through the bed layer while minimizing the radial diffusion coefficient of downward-flowing liquid. The saddle shape also enhances liquid distribution and gas passage. Made of durable materials, these rings are highly resistant to heat, inorganic acids, hydrofluoric acid, and many organic solvents.
Supplier Origin
China – Verified Manufacturer
Coordination
Singapore-Based · UEN 202519429N
Reference products from established manufacturers. YUXINGCORP coordinates sourcing; it is not the manufacturer.
| Diameter (mm) | D x H x T (mm) | Surface (M2/M3) | Free Vol (%) | Number Per M3 | Weight (Kgs/M3) | Dry Packing Factor (m-1) |
|---|---|---|---|---|---|---|
| Φ 25 | 25 x 20 x 0.6 | 185 | 0.96 | 101160 | 409 | 209 |
| Φ 38 | 38 x 30 x 0.8 | 112 | 0.96 | 24680 | 365 | 137 |
| Φ 50 | 50 x 40 x 1.0 | 75 | 0.96 | 10400 | 291 | 85 |
| Φ 76 | 76 x 60 x 1.2 | 58 | 0.97 | 3320 | 245 | 63 |
Spec sheet
Metal Intalox Saddle Rings
PDF · Specification for reference
How We Work - Our Commitments
Each commitment carries a condition and a remedy. A promise without conditions is marketing.
- Sourcing & Supplier Matching
Commitment:
A written sourcing report within 48 hours of a complete requirement brief.
Conditions:
Requires machine type or output target, destination country, and timeline. Custom or multi-line projects may take longer – we tell you upfront.
Remedy:
If we cannot meet it, you receive an interim response with a firm date –
not silence.
- Pre-Shipment Inspection
Commitment:
Third-party pre-shipment inspection – SGS or BV – before balance payment is released.
Conditions:
Included as standard on production-line projects. Available on request for single machines. Scope agreed in writing before booking.
Remedy:
If inspection fails against the agreed specification, shipment does not release until corrected or you approve a deviation in writing.
- Export Documentation
Commitment:
Complete export document pack – commercial invoice, packing list, certificate of origin, and destination-specific conformity documents.
Conditions:
Destination conformity regimes (CE, EAC, SABER/SASO, PVOC, SONCAP) vary and change. We confirm the applicable route per project before contract.
Remedy:
If a document we are responsible for causes a customs hold, we resolve it and carry the correction cost.
- Warranty & After-Sales
Commitment:
12-month equipment warranty with a named responsible contact and a written spare-parts dispatch commitment.
Conditions:
Covers manufacturing defects under normal operation and specified maintenance. Wear parts and consumables excluded.
Remedy:
Dispatch window and remedy – details to be confirmed. Contact us for project-specific warranty terms.
Need configuration advice, landed cost estimate or a project-specific sourcing report? Submit your requirements.
What we handle
Equipment sourcing & supplier coordination
Pre-shipment inspection – SGS or BV – before balance payment
Export documentation – invoice, packing list, certificate of origin
Customs clearance & destination conformity support
Shipping & freight logistics coordination
Installation guidance & commissioning support